

Flood-test your roof for 24 hours
Before the screed or tiles go on, plug the roof drains and cover the membrane with about 5 cm of water. Leave it at least 24 hours (48 is better), then check the ceilings and walls below for damp. Dry? Drain slowly and carry on. Damp? Fix it before anything covers it.
Have you ever flood-tested your roof before the rains?
Tap an answer to vote.
More tips
