Building permit in Saudi Arabia: the steps before work starts

Deed, survey decision, soil test, an accredited design office and Balady: the steps to a villa building permit in Saudi Arabia, the setbacks and a worked example.

By SouqHouseUpdated Nov 17, 20265 min read
Building permit in Saudi Arabia

In Saudi Arabia, no villa work can start without a building permit issued on Balady, and you don't apply alone: a design engineering office accredited by the Ministry applies for you. Once the drawings are ready, Balady lists the service at 1–10 days, and the permit stays valid for 3 years. Most delays happen before that: deed, survey decision, soil test and drawings.

The building permit at a glance

StepWho does itKey number
Updated electronic deedYou (Ministry of Justice)Must be current
Survey decision (القرار المساحي)Engineering office, on BaladyValid 3 years
Soil study reportSoil testing labRequired for the permit
Drawings and applicationDesign office you delegate on BaladyAccredited by the Ministry
Supervising office and contractorChosen on BaladyContractor must be classified
Review and issueMunicipality and technical examiner1–10 days on Balady
PermitRenewable from 90 days before expiryValid 3 years
Occupancy certificateAfter the worksPermit at least 6 months old

1. Check the deed and the plot

Balady asks for an updated electronic deed from the Ministry of Justice. If your deed is old or on paper, update it first. Then note the width of every street around the plot: the setbacks below are calculated from it.

For villas, the residential building rules approved in 2024 set:

SetbackRule
Front, street under 30 m1/5 of the street width, at least 3 m
Side and rear streets1/5 of the street width, at least 2 m
Front, street 30 m or widerAt least 6 m
Towards neighboursAt least 1.5 m

The same rules allow up to 75% ground-floor coverage. Your plot's approved plan can add its own conditions, so ask the design office to confirm them first.

2. Get the survey decision (القرار المساحي)

The survey decision fixes your plot's boundaries and dimensions for the permit. The engineering office can issue it on Balady, or you can pick an existing one. It is valid for 3 years; after that you apply for a new one. If you bought the plot next door, the two plots must be merged with a new survey decision before the permit.

3. Order the soil test

A soil study report is one of Balady's requirements. It tells the structural engineer what foundations the villa needs, so order it before the structural drawings, not after.

4. Hire a design office and delegate it on Balady

You log in to Balady with your national access, start a permit request and delegate an accredited design office. The office accepts, selects the survey decision and prepares the architectural and structural drawings to the Saudi Building Code. Villas for one or two families up to three floors follow the code's residential section.

5. Choose the supervising office and the contractor

Before the permit is issued, Balady requires a contract with a supervising engineering office and a construction contractor. The contractor must be classified on Balady. Choosing them now matters: the supervisor will check the work stage by stage, which is also how you should split the contractor's payments.

6. Review, fees and issue

A technical examiner, the municipality and any outside authority the project needs review the drawings. The design office then reviews the municipal fees, issues the invoice, and the permit is issued once the fees are paid. Some mandatory items are completed by the contractor directly on Balady, so read the full, current requirement list on the Balady building permit page before you plan your dates. The same service also issues a fencing permit if you only want to build the boundary wall first.

7. During and after the works

  • Build what the permit shows. Extra coverage, an extra floor or ignored setbacks must be removed at the owner's cost; where removal would harm the structure, the penalty is half the cost of the part that breaks the rules.
  • Changes go through Balady's service for adding and amending building components.
  • Renewal: if the work isn't finished in 3 years, renew from 90 days before expiry.
  • Occupancy certificate: issued for a permit at least 6 months old. It is needed to activate the permanent electricity supply, and Balady then issues the building compliance certificate on its own.

Example: setbacks on a 20 × 30 m plot

A villa plot with 20 m of frontage on a 20 m street, neighbours on the other three sides:

  • Front setback: 20 ÷ 5 = 4 m (more than the 3 m minimum)
  • Side and rear setbacks to neighbours: 1.5 m each
  • Buildable width: 20 − 1.5 − 1.5 = 17 m
  • Buildable depth: 30 − 4 − 1.5 = 24.5 m
  • Footprint: 17 × 24.5 = 416.5 m², under the 75% limit of 600 × 0.75 = 450 m²

On this plot the setbacks, not the coverage limit, decide the largest ground floor. The 400 m² villa in our villa cost guide needs only 400 ÷ 2 = 200 m² per floor, which leaves room for a garden and parking.

Before you call an engineering office

  1. Update the deed and note the width of every street around the plot.
  2. Check the survey decision: does one exist, and is it under 3 years old?
  3. Order the soil test so the structural design starts on real data.
  4. Compare accredited offices in the SouqHouse directory: design, supervision, and how many villas they have taken through Balady.
  5. Get 3 quotes from verified contractors once the drawings are ready: post your job for free, and use the site inspection checklist from the first excavation.
  • New build
  • General contracting